Do You Need a Permit for a Patio or Retaining Wall in Montgomery County, MD?

Guides

Do You Need a Permit for a Patio or Retaining Wall in Montgomery County, MD?

By Emerald Landscaping Corporation · Updated November 25, 2026 · 4 min read

Permits are one of the first questions homeowners ask before a hardscape project. The short answer in Montgomery County is that it depends on what you are building and where you live. A simple patio and a four-foot retaining wall are treated very differently, and several cities and towns in the county run their own permit offices. This guide summarizes the rules we check before every project. It is general information, not legal advice; the final word always belongs to the permitting office for your address.

Who issues permits for your address

For most of the county, including Bethesda, Potomac, Silver Spring, Germantown, Olney, Damascus and Clarksburg, permits come from the Montgomery County Department of Permitting Services (DPS), located at 2425 Reedie Drive in Wheaton. Some municipalities are different:

  • Gaithersburg and Rockville are incorporated cities with their own permitting offices. A Gaithersburg or Rockville mailing address does not always mean you are inside city limits, so we check the exact address.
  • The Town of Kensington asks for a Town permit in addition to the County permit for exterior work.
  • Chevy Chase includes several incorporated villages and towns, such as Chevy Chase Village and the Town of Chevy Chase, and many of them issue their own permit after the County permit.
  • Historic districts, such as parts of Kensington and Chevy Chase Village, need a Historic Area Work Permit reviewed through the county’s historic preservation process before exterior changes.

Retaining walls

Retaining walls are the hardscape item most likely to need a permit. Under DPS rules, a residential retaining wall needs a permit when:

  • the retained height is over 3 feet (36 inches);
  • it supports any surcharge load, such as a driveway, parking area, a structure or a slope above it;
  • it crosses a lot line;
  • it is built in problem soils; or
  • it is part of a tiered system of stacked walls.

A wall built on the property line needs a letter of approval from the neighbor with the permit application. Retaining walls are not permitted in the County right of way, and a wall taller than 6 feet 6 inches is treated as an accessory structure. Taller walls also need an engineered design. On the retaining walls page you can see how we build walls with a compacted footing and drainage stone behind them.

Grading and land disturbance

Montgomery County requires a sediment control permit when a project disturbs 5,000 square feet or more of land, or moves 100 cubic yards or more of earth. Most backyard patios are well under those numbers, but a large regrading project, a long wall with a lot of cut and fill, or a whole-yard renovation can reach them. Gaithersburg also asks for a site permit for grading and for improvements such as retaining walls within city limits.

Patios and walkways

DPS lists private walkways among the work that does not need a permit, and a simple paver or stone patio laid at grade generally falls in the same group. What changes the answer is what comes with the patio: walls over the limits above, raised areas, a deck, a roof or pergola structure, electrical work for lighting, or enough grading to trigger sediment control. Decks always need a building permit in the county. Even when no permit is required, the patio still has to respect setbacks, easements and your HOA rules.

Driveways and the right of way

Replacing a driveway on your lot is different from changing the apron where it meets the street. Work in the public right of way, including a new or wider curb cut, needs a right-of-way permit from the county or, in incorporated cities, from the city. Read more about paver and concrete driveways.

Drainage

A French drain or downspout line must send water to an approved outlet on your property, never onto a neighbor’s yard or across a sidewalk. Tying into a street curb or storm system is right-of-way work. Whether a drainage project needs a permit depends mostly on how much ground it disturbs.

HOAs are separate from permits

A county permit does not replace HOA approval, and HOA approval does not replace a permit. Many communities in Germantown, North Potomac, Clarksburg and Olney require an architectural application before any exterior change. See our guide to HOA approval for patios and hardscape.

What we do before we schedule

  • Confirm which office issues permits for your exact address.
  • Measure retained heights and check for surcharges, lot lines and easements.
  • Estimate the area of disturbance for larger projects.
  • Prepare drawings for your HOA or design review when needed.

Not sure what your project needs?

Send a few details and, if you can, a photo of the area. We schedule a site visit and give you a written, itemized quote. Emerald Landscaping Corporation has served Montgomery, Howard and Frederick counties since 1998 (MHIC No. 120316).

Get my quote  or call (301) 253-3239

More guides

Practical reading before you start a project.

Call nowGet a quote